>  HOME  >  BROWSE  >  CASE STUDIES

HSBC

LOCATION: Chicago, IL
3form ADVANTAGE: custom hardware/architecture
HSBC

Synopsis

The CHALLENGE:
To create a feature ceiling installation with hanging oval panels without the excessive cost of structural steel required for glass.

The PLAY:
3form developed a custom hardware system and worked closely with the design team and the contractors to test and troubleshoot the entire installation. The project scope included CNC cutting, structural design consultation, hardware design, shop drawing, and prototyping. 3form also helped produce and fabricate the complex substructure as well as custom color match the spline detail HSBC red.

The RESULT:
The ceiling has maximum impact with minimal cost.

Materials Used

vapor
vapor